Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.
Related coverage
- Marine Mammals; Incidental Take During Specified Activities; Proposed Incidental Harassment Authorization for Southwest Alaska Stock of Northern Sea Otters in Kodiak, Alaska
- Employee or Independent Contractor Status Under the Fair Labor Standards Act, Family and Medical Leave Act, and Migrant and Seasonal Agricultural Worker Protection Act
- Administrative Disaster Declaration of a Rural Area for the State of New Hampshire
- Administrative Declaration of a Disaster for the Territory of Guam
- Miscellaneous Technical Amendments; Technical Amendment
- Extension of Import Restrictions Imposed on Archaeological and Ethnological Material of Egypt